Answer Structure

AI responses typically include:

  1. Direct Answer - The main response to your question
  2. Supporting Details - Additional context and specifics
  3. Source References - Links to original documents
  4. Confidence Indicators - When information may be uncertain

Reading Responses

Clear Answers

When the AI finds relevant information:

"According to the structural specifications (Section 3.2), the foundation requires C30/37 concrete with a minimum depth of 800mm."

The response includes:

  • Direct answer to your question
  • Source reference (Section 3.2)
  • Specific details (concrete grade, depth)

Partial Answers

When information is incomplete:

"The electrical specifications mention cable requirements, but I couldn't find specific details about conduit sizes in the uploaded documents."

The AI clearly states:

  • What was found
  • What's missing
  • Suggestions for clarification

No Information Found

When no relevant data exists:

"I couldn't find information about HVAC specifications in the project documents. This topic may not be covered, or documents may need to be uploaded."


Source Indicators

Document References

Answers reference source documents:

  • Document name - Which file contains the information
  • Section/Page - Where to find it
  • Quote - Relevant excerpt when applicable

Multiple Sources

When information comes from several documents:

"Based on the structural report and the contractor specifications..."

Click Sources to see all referenced documents.


Confidence Levels

High Confidence

Clear, direct information from documents:

  • Specific numbers, dates, specifications
  • Direct quotes from documents
  • Unambiguous statements

Lower Confidence

Inferred or synthesized information:

  • Summaries across multiple documents
  • Interpretations of requirements
  • General overviews

Verify Important Information

For critical decisions, always click through to the source documents to verify the context.


Common Response Types

Lists and Tables

For queries about multiple items:

Item Status Assignee
Roof inspection Open Jan
Electrical check Complete Maria

Summaries

For overview questions:

"There are currently 15 open items: 8 actions, 4 issues, and 3 questions. Most are assigned to the electrical contractor."

Step-by-Step

For process questions:

"To request a permit extension: 1. Submit form B-12 2. Include justification letter 3. Allow 5 business days for review"


When Answers Seem Wrong

Verify Sources

  1. Click on source references
  2. Read the original context
  3. Check if information is current

Rephrase Your Question

Try asking differently:

  • More specific terms
  • Different keywords
  • Break into smaller questions

Report Issues

If answers are consistently incorrect:

  • Note the question and answer
  • Check document quality
  • Contact support if needed